Sunday, 24 August 2014

It's like thunder, it's like lightning - the way you love me is frightn'in

OK so I won't be needing them any time soon and maybe I ought to have waited, but the opportunity presented itself  and I just couldn't not take it...I'm talking floorboards. I've got 125sq metres of reclaimed floorboards at a bargain price from a lovely man called Anthony from Whiteheads Timber of Oldham. (0161 626 6488: 07927455919 if you're looking for reclaimed timber - he comes highly recommended.)

Reclaimed-7-Wide-Pine-Wooden-Flooring-Rustic-Floor-Boards-Solid-Wood

He met me in Edinburgh and we transferred them from his van to my trailer before I returned  to Aberdeen.They are immaculate, no nails, nail holes, carpet tacks; indeed they've never actually been walked on. They came from a hospital demolition in Liverpool, range from 6 to 15 ft long and are 7 inches wide. They had been bolted onto a concrete subfloor and then covered with a thick lino. The ends have been sawn off so I'm left with a complete and immaculate replacement downstairs floor which is just going to need the lightest of sandings and then fitting and sealing. I'm going to experiment with stain and/or varnish to find the most pleasing finish and then...I think there might be a bit of a wait before you see them in situ!!!


This is what 125 square metres looks like...about a ton and a half and floor to ceiling in a shipping container!!!


Thursday, 14 August 2014

If you can trust yourself when all men doubt you...

Well there were two major leaks in the roof that had caused a lot of internal damage, For example this small hole in the zinc flashing...

led to this!


and, over the years, two missing tiles meant this


One of the things I'd been dreading was to check how successful my hypnotherapy had been when it came to climbing to the top of the ridge on the main roof. I can theoretically begin to learn how to do any building skill but you can't learn how not to be scared witless at the prospect of challenging a great fear. I was feeling shaky at the top of the scaffolding and the roof ladder seemed to stretch ever upwards. I literally couldn't afford not to succeed so I took a deep breath and...


I DID IT!

Not only that but I completed my first proper repair to the roof...tiles off, sarking replaced and then slates trimmed, cut, shaped and perforated for the new copper nails





not bad for a beginner, you can't see the edges of the repair


so you can see I felt justifiably pleased with myself. No more demons and a job which now looks like it didn't need doing. We're well on the way to wind and watertight now, the next trip in September will be to see to the doors and fit the two new windows. 







Thursday, 7 August 2014

Wet behind the ears

Well I thought it would just be a case of pumping out the dirty water and refilling the tank, how naive can you be. The sludge was about 10"" deep and needed to be shovelled out...and it was quite a big tank!


But after about eight hours the sludge was mostly gone


 and the water ran clear


I'm slowly beginning to realise that what seems like a simple task can take so much longer than you think it will. Connecting the tank to the house will have to wait till another time. There's a couple of important things to see to first, and a bit of an obstacle to overcome

Thursday, 31 July 2014

Good things come in threes


Number one was hard to miss


It's not everyday you have the world's largest sail powered ship pass by your window.This was Wind Surf as it sailed majestically between Eigg and Arisaig.

Number two was easy to find if you knew where to look


In the mid left of this picture you can see a square concrete box. Whilst looking for the water supply, John told me that this holding tank was part of the system. A bit further up the field we found a larger box which was the main storage tank. Apparently it fills from a small spring and the only reason there's no water in the system is that it's sludged up and the pipes are blocked. So 100m of alcathene pipe and a few fittings plus the loan of JB's sludge pump should see water back at the Manse again.

Everyone knew where number three was, and now so do we.


The roof is covered with Ballachulish slate. The quarry is closed now and, although there would be a demand if it were to reopen, there are environmental reasons not to do so. The result is that the slates are very expensive...if you can find them. Well the good news is that we did find some, and the even better news is that they were not too expensive...they were FREE! Behind the old shop here are about seven builder's bags of slates which have been taken from other houses on the island and dumped/stored there. A quick check with the Trust that it was ok to sift through for good ones and 


BINGO...about 250 so far. Another visit should see us with enough to replace and missing and broken ones and give us a supply for repairs if required after any future storms. 




Monday, 21 July 2014

How do you eat an elephant?


...one bite at a time

Progress has been slower than I hoped recently. It just takes so long to take out, replace and putty new panes of glass into frames that are tired and weary.


However I'm getting towards the end and the frame repairs will keep me busy during the long winter evenings. I was however thwarted by a family of swallows who, having had years of nesting inside, were determined not to relinquish their association with the Manse and built a nest on a sheet of board that covers the bathroom window 


I guess I'll just have to wait till they're fledged...it's not like there's nothing else to be getting on with


Meanwhile Do has been busy perfecting her brush strokes and working on the two replacement dormer windows.



Monday, 30 June 2014

Working towards wind and watertight...first attempts at puttying and Flashbanding


It might not look very impressive but here are my first three panes fitted, puttied and curing. Only another 4 or 5 dozen to go!!!


and here is the first joint effort...Do chased out the old putty and I fitted the glass and applied
 the new, what a team!

We erected more scaffold to get access to the main roof 


so I could  take about 2 square metres of stinging nettles and an empty birds nest out, realign a few slates and cover with some Flashband.


New dormer windows have been ordered and hopefully will be ready for our next trip at the beginning of July. 


More temporary repairs to the kitchen roof


the view from which never fails to amaze and delight







Tuesday, 17 June 2014

The show is on the road, well at the end of a new one anyway


First sight of the new roadway that leads down to the house




round the side


and some excavation at the back.