It was blowing a hoolie today so no surprise that the boat was cancelled. However, on the plus side it meant I was here to find out where further roof repairs are needed and that the bowl I had left wasn't quite in the right position to catch the drips. Result! (sort of)
Moving on, the next job was framing the corridor and second fixing the electrical sockets
Moving on, the next job was framing the corridor and second fixing the electrical sockets
a good day's work - better than sitting on a boat in a force 10 gale
No comments:
Post a Comment