The morning was spent fitting the remaining three sockets and joining wires with connection boxes. Then John came round to link the new ring to the consumer unit so a test could be carried out.
Some of the sockets on the ring showed a fault - it turned out to be just one neutral wire in sixteen outlets hadn't been secured in the terminal, Once this was done it was a perfect two green lights in at every socket.
Naturally this necessitated a whisky moment
Job done!
No comments:
Post a Comment