Monday, 5 March 2018

"A failure is not always a mistake, it may simply be the best one can do under the circumstances. The real mistake is to stop trying." B. F. Skinner

I'll put this one down to tiredness rather than stupidity. The pictures tell the story, writing the words would be too painful






Part of the floor needed fitting before the correct height for the pine kitchen unit could be worked out. However, some months previously when fitting the sockets...






and all was well with the world

Saturday, 3 March 2018

"Authors want their names down in history; I want to keep the smoke coming out of the chimney." Mickey Spillane

March has been a quiet one on the renovation front as I spent time visiting student teachers on school experience in Fife. However I did manage some time on Eigg at the beginning of the month.


This is the kitchen wood burning stove and it's not obvious from this picture that there is no chimney. So









The cowl and connecting flue will be fitted on the next visit

Saturday, 24 February 2018

"I make work a bit like how you mix cocktails - with ingredients like budget, history and location." Florentijn Hofman

and if I might add to the above - "budget, history, location and all the parts needed for the job you've planned!!!"
The focus this time was to fit the log burner in the kitchen. Unwisely, I had previously ordered all the parts I thought I would need. 


When I unpacked the box however, it turned out I had miscalculated and was missing a 1m length of flue, supporting brackets and flue sealant. (Memo to self - talk it through with the supplier before placing the order) Hence the need for an ad hoc cocktail of jobs for which I had the necessary parts. So I cracked on and cast a concrete platform for the stove to stand on



(The parts have serendipitously just been delivered as I'm writing this so hopefully I'll be able to complete the job next week.)

The skylight above the kitchen had been temporarily repaired with perspex sheets by John.


 Two years on I thought it was time to replace them and effect a more permanent repair.



The remaining missing slates to be fixed when it's noticeably warmer and less windy.

The kitchen is rapidly approaching the time when this,


which we found under a pile of debris when we first bought the house, needs modification to take a Belfast sink. I added supports and will take the necessary plumbing parts with me next week


With most of the really dirty work in the kitchen and snug done, I decided to separate the last part of the "building site" that is the dining room from the rest of the house and so hopefully minimise the insidious invasion of dust.



The final job for this visit was to hang and glaze the magnificent original front door.

 



Three hinges on a heavy door - perfectly balanced at the first attempt and glass mm perfect! 

Image result for dalwhinnie 15

Sorted! Back a week today for the next phase




Thursday, 8 February 2018

"I spend a lot of time doing carpentry. Sometimes there is nothing that gives me the contentment that sawing a piece of wood does." Abbas Kiarostami

Today was the day when I would ratify the decision to buy 125 square metres of second hand floorboards. Their previous life had been under a vinyl floor in a hospital in Liverpool and they had been stored first in a container in Aberdeenshire, then stacked in a dusty pile in the dining room. 


The first attempt using a hand sander made me realise I would need a faster and more effective tool. Enter the "wood thicknesser"


which turned this


into this.


A belt sander took off the sharp edges and contours


and I was more than a little chuffed with this


Only another 100 square metres to go!



Tuesday, 6 February 2018

"Nurturing a project from the ground floor is something I've been wanting to do." Jimmy Smits

and speaking of floors


With man Friday becalmed by man Flu, I was limited to jobs which can be done single handed. So, I decided to make progress with the snug.



Having de-nailed and treated the joists and boards I screwed the battens to the concrete floor 


before fitting the insulation boards


Tomorrow... the floorboards!


Sunday, 4 February 2018

"What is a soul? It's like electricity - we don't really know what it is, but it's a force that can light a room." Ray Charles

Slow but cathartic process of wiring the lighting spur to fit junction boxes, switches and light fittings





Unfortunately none of it worked initially but I was doubly pleased when I tracked the fault to the consumer unit where a connection was missing to make the spur live


Thus, inevitably...





Saturday, 3 February 2018

"Know the function of a fuse box and the appearance of a tripped circuit breaker." Marilyn vos Savant

The morning was spent fitting the remaining three sockets and joining wires with connection boxes. Then John came round to link the new ring to the consumer unit so a test could be carried out.


Some of the sockets on the ring showed a fault - it turned out to be just one neutral wire in sixteen outlets hadn't been secured in the terminal, Once this was done it was a perfect two green lights in at every socket.


Naturally this necessitated a whisky moment



Job done!